spacebert_ecss | The VCD shall collect in the form of a matrix, for each requirement, the following verification information: 1. Requirement identifier, 2. Requirement text 3. traceability between requirement, 4. Levels and stages of verification, 5. methods, 6. link to the relevant section of the verification plan and any planning document, 7. References to any documentation that demonstrates compliance to the requirements, 8. Status of Compliance (yes, no, partial), 9. Close-out status (open / closed), 10. Reasons of the close-out status, |
spacebert_ecss | The applicable quality levels defined in Table 7-3 shall apply. |
2008_earthcare_web | In all modes, the AOCS shall provide to the ground sufficient housekeeping data to perform shutdown and isolation of malfunctioning parts. |
spacebert_ecss | Upon request of the NRB, the supplier shall submit a request for waiver for major nonconformances with the use as-is or repair disposition for customer approval. |
spacebert_ecss | The TAC shall summarize the test results used for the TAC. |
2021_tmt_ord_WEB | The TMT Observatory shall support the following general communication services within the Observatory as well as between the Observatory and the general Internet using voice over IP (VoIP). |
2004_hp_srs_web | All Herschel / Planck on-board software shall be delivered to ESA in source form, including all building scripts necessary to regenerate the on-board image. All supporting documentation shall also be delivered to ESA |
2019_jpss_l2_WEB | The NESDIS ESPC shall support software updates while satisfying all functional and performance requirements. |
spacebert_ecss | The request sequencing subservice shall provide at least one of the following capabilities: 1. the capability to directly load a request sequence specified in clause 6.21.5.2; 2. the capability to load a request sequence by reference specified in clause 6.21.5.3; 3. the capability to load by reference and activate a request sequence specified in clause 6.21.5.6. |
spacebert_ecss | The test procedures shall be validated in accordance to customer requirements or specifications. NOTE This validation can include the determination of relative or absolute efficiencies of the sampling and analysis method to establish a correction factor for the absolute bioburden numbers. |
spacebert_ecss | The supplier shall nominate a project manager with a project team under his authority and reporting directly to him. |
spacebert_ecss | The technology matrix shall contain a description of the purpose, objective, content and the reason prompting its preparation. |
spacebert_ecss | The statistical interpretation of the scale factor error shall be defined by the customer. |
spacebert_ecss | For qualification, each device shall meet the requirements specified in the appropriate table of clauses 4.11 and 4.12 after exposure to the complete sequence of conditions specified in Table 4-25. |
spacebert_ecss | In the computation of safety margins the following minimum factors of safety shall be used for standard metallic materials: 1. buckling factor of safety: 2 |
spacebert_ecss | As a minimum, the following tasks shall be performed and documented in a validation report: 1. carry out the validation according the established validation plan; 2. design and build the test set-up or system breadboard in order to represent a realistic system application; 3. use the breadboard to perform validation tests that cover full functionality and all operating modes and conditions of the device; 4. specify, design and execute specific burn-in or other screening tests for the later test of the FM parts; if agreed by the business agreement; 5. document scope, sequences, set-up and results of the validation tests in the validation report; NOTE The validation report becomes part of the design validation documentation. 6. Compare specified parameters with measured parameters. |
2017_s45_mrtd_web | For any spatial sample, the Instrument Integrated Energy (IIE) over an area of dimension 1.0 SSD along track by 1.0 SSD across track shall vary by less than 10 percent points over the spectral range containing the UV, Vis, NIR-1, and the NIR-2. |
spacebert_ecss | Qualification tests shall be performed to verify that the structure design and manufacturing technique fulfil specification requirements. NOTE Qualification tests can include static tests, dynamic and acoustic tests, and other tests (e.g. thermal stress test). |
2008_earthcare_web | At EOP, the satellite shall dispose of all remaining fuel, if it can be demonstrated that it will burn up during re-entry in the atmosphere and does not pose any hazard, or the satellite de-orbiting shall commence and a controlled re-entry in the atmosphere shall be allowed. |
spacebert_ecss | If the mathematical model predictions are outside the applicable correlation criteria, the mathematical model shall be modified and the analysis rerun until it meets the criteria. |
spacebert_ecss | It shall be possible for the QoS of a virtual channel, used by a virtual network on one link, to be different to that of other virtual channels on other links used by that same virtual network. |
spacebert_ecss | If the specified output port does not have a virtual channel with the same virtual network number as that on which the packet arrived in the input port, the packet shall be discarded and an invalid output port error recorded by the routing switch. |
2012_d51_web | The SIT sub-system shall automatically request a Central Operations service to generate a unique configuration file associated with each unique version comprising of the following information - |
2005_skal1_WEB | For each search sub-array within SKA1_Mid Pulsar search, the processing shall be capable of searching for single dispersed pulses over dispersion measure range up to 3000 pc cm-3 commensally with searches for periodic pulses with a S/N performance better than 7 |
spacebert_ecss | The PCB manufacturer shall complete the MRR checklist. |
2007_trs_mrd_web | The onboard data storage system shall have sufficient reliability to allow compliance with R-2.7.2-1 |
spacebert_ecss | Non-interruptible sequence shall be identified in the procedure. |
spacebert_ecss | The PCB manufacturer shall have a work instruction for in-process IST control. |
spacebert_ecss | For each telecommand packet transporting a request to detail-report all position-based scheduled activities, the application data field shall be omitted. |
spacebert_ecss | Static analysis shall be performed to verify that the structural responses (e.g. displacements, forces, stresses and internal loads) to (quasi) static loads conform to the structural requirements. |
spacebert_ecss | Test jigs shall ensure a tensile loading parallel to the fastener main axis. |
spacebert_ecss | The SCD-CVG shall include the same provisions as for the mechanical properties for the qualification tests (in conformance with D.2.1<8.5> a1, 2 and 3). |
spacebert_ecss | The Pre-storage review shall: 1. confirm the configuration of the item to be stored as agreed in the Storage Plan in conformance with DRD from Annex A including status of all RFD or RFWs, NCRs and open work; 2. ensure that storage documentation, specified in the requirements from the clause 5.2, is available and covers all storage activities and duration; 3. ensure that storage resources are available in terms of tools, storage support equipments, facilities and personnel and fulfil the conditions documented in the storage plan; 4. conclude on the acceptability to start the storage; 5. identify periodic inspection and testing. |
2008_keepass_PURE | Data Flow |
2021_tmt_ord_WEB | Visitor instrument data shall be stored in the TMT DMS. |
spacebert_ecss | The design report, PSA, WCA, FMECA, thermal Analysis, Radiation Analysis, EMC analysis for electrical design, supported by the detailed circuit diagrams, shall be included in the DJF NOTE The DJF contain all descriptions and analyses meant to verify that the design meets the requirements. For the DJF, see ECSS-E-ST-10. |
2013_echo_mrd_WEB | The MOC shall be responsible for the spacecraft operations after launch, including mission planning, spacecraft monitoring and control, and orbit and attitude determination and control. |
spacebert_ecss | In a virtual network, N-Chars from one packet shall not be interleaved with N-Chars from another packet. |
2021_gmt_oad_web | The AGWS subsystem shall be maintainable within 706 hours per year. |
spacebert_ecss | The Data Link layer shall be responsible for establishing communications across the SpaceWire link, for controlling the flow of information over the link, for sending and receiving N-Chars, for sending and receiving broadcast codes and for re-establishing communications across the link after errors that occur over the link. |
spacebert_ecss | The requirements included in the document shall be applied independently from the selected procedure delivery media. |
spacebert_ecss | The forward voltage of the string blocking diode (if present) shall be computed: 1. using the worst-case voltage drop specified by the diode manufacturer, 2. at the diode operating temperature corresponding to the operational string current for each mission phase in worst case conditions. |
2011_dot_WEB | The Data Distribution Subsystem shall provide information to a catalog describing the quality characteristics of the type of data the data provider is sending. |
2008_earthcare_web | The spacecraft shall have the knowledge of the actual health status of all the hardware units required for any mode start that is potentially hazardous (e.g. attitude control modes). It shall be possible to override this information by telecommand, and it shall be available in telemetry. |
2021_gmt_oad_web | The ASMS and FSMS shall have a range of motion in the M2 segment RY rotation degree of freedom of ± 3000 ?rad. |
spacebert_ecss | The line receiver shall be operational when the line receiver enable signal is asserted. |
spacebert_ecss | The IST cycling may be performed to a temperature of 210 °C. |
2021_tmt_oad_WEB | An overhead monorail crane shall be available in the Utility Room with a 2 ton (1,814 kg) capacity. |
2005_skal1_WEB | SKA1 shall be able to produce VLBI beam output data with either dual or single polarization |
spacebert_ecss | Each position-based schedule summary report shall contain, for each scheduled activity to summary report, a notification consisting of: 1. if sub-schedules are supported, the identifier of the sub-schedule; 2. if groups are supported, the identifier of the group; 3. the scheduled release position; 4. if persistent scheduling is supported: (a) the activity persistency status; (b) if the activity persistency status is "persistent", the persistent activity periodicity; 5. the identifier of the related request consisting of: (a) its source identifier; (b) its application process identifier; (c) its sequence count. |
spacebert_ecss | When the user has a packet to send over the SpaceWire network, it shall generate a SEND_PACKET.request primitive to request to send the SpaceWire packet over the network. |
2005_skal1_WEB | A hazard analysis shall be performed at the system and element level in accordance with BS IEC 61882 and, where applicable, shall include a FMEA in accordance with EN 60812. |
spacebert_ecss | Working surfaces shall be covered with an easily-cleaned hard top or have a replaceable surface of clean, non-corrosive, silicone-free paper. |
2021_gmt_ord_web | The GMT Observatory shall be able to start a science exposure on a new target with any deployed instrument in less than 600 seconds from the initiation of slew. |
spacebert_ecss | If containment cannot be verified, the hazardous substances (and any part of the space system that has potentially been exposed) shall not be returned to Earth (unless sterilized in space). |
spacebert_ecss | The minimum stripping force, see Table 5-3, shall be measured and recorded after the force has been applied and before the wrapped conductor has been moved one wire diameter from its original position. |
spacebert_ecss | The provider of the bioburden reduction service shall demonstrate that the installation and operational qualifications are valid for the activities duration. |
spacebert_ecss | A node supporting distributed interrupts in the interrupt with acknowledgement mode shall conform to clause 5.6.5.4. |
2012_d51_web | The SIT sub-system ECV product processing chain shall contain a Leads Filtering module performing functionality as described in [R-9] §6.1 |
spacebert_ecss | Requirements for contamination control during the product life cycle as specified in ECSS-Q-ST-70-01 clause 5.2 shall apply. NOTE Requirements for TCS cleanliness and contamination control can be part of the system cleanliness and contamination control plan. |
2006_eirenesys15_PURE | The network services necessary to meet the range of UIC requirements are detailed below. These services are to be considered as a minimum set for implementation within each GSM-R standard network. Railways may implement additional network services as desired. (I) |
spacebert_ecss | The limit loads are derived as follows: 1. For cases where a representative statistical distribution of the loads is known, the limit load shall be defined as the load level not being exceeded with a probability of 99 % and a confidence level of 90 % during the service-life. 2. For cases where a statistical distribution of the loads is not known the limit loads shall be agreed with the costumer. NOTE It is good practice to determine the loads using conservative assumptions. 3. For pressurised systems, the maximum expected operating pressure (MEOP) shall be part of the limit loads. |
2019_jpss_l1rds_web | Sensor trending data shall be analyzed and the trending analysis results archived and made accessible to the JPSS stakeholders. |
spacebert_ecss | The real time acquisition shall be specified by the customer. |
2005_skal1_WEB | The SKA1_Mid, for each sub-array, shall have a maximum noise leakage power from non adjacent frequency channels better than -60 dB. |
2005_skal1_WEB | External sources of information used by the Elements shall be cached by Telescope Manager. No sources other than those cached by TM shall be used. |
2019_gateway_WEB | The Gateway shall allocate a minimum of 5.15 Tbits/day (644 GB/day) for utilization use. |
spacebert_ecss | Any PFCI containing detected defects shall not be used without approval of the customer. NOTE 1 The first option to be considered when a defect is detected in flight hardware is to remove or repair the defect. NOTE 2 For highly critical hardware (especially when used for manned spaceflight), more conservative verification methodology can be requested by the customer (see e.g. NASA-HDBK-5010). |
spacebert_ecss | Definition of containers shall be in conformance with the latest version of UNECE regulations ST/SG/AC.10/1 . |
2021_gmt_oad_web | Observatory IT will provide communication between the facilities on the summit, the support sites, the base facility, and the outside world through the Observatory IT Network. Observatory IT is separate from the Observatory Computing Network (OCN) and the ISS network. In general, hardware will be located within rooms in specific buildings, hence contained within the PBS of those buildings, while the connecting fibers will be part of Site Infrastructure. Internet service to the GMT site during the construction phase is provided by a connection to the existing LCO network. The construction internet system has a bandwidth of approximately 100 Mbps. |
2012_stequest_mrd_web | DC non-gravitational accelerations on the spacecraft shall be less than 1E-6 m/s2 , within the instrument volume, when measuring. |
spacebert_ecss | Testing of circuits shall be performed at equipment level by the application of voltage spikes on input, output and power lines. |
spacebert_ecss | Dross and burned, residual flux shall be removed from the surface of the molten solder immediately prior to solderability test. |
2021_tmt_oad_WEB | Components of the observatory wide fire system shall be mounted on the telescope structure to detect smoke and heat caused by a fire on the telescope or telescope. |
spacebert_ecss | Cryostats shall be NDI inspected prior to the proof pressure test. |
2019_gateway_WEB | The Gateway shall enable two-way private audio and motion imagery communication between the ground and crew. |
spacebert_ecss | The thruster shall provide the required performance over the full thrust range. |
spacebert_ecss | The SRelD shall list all the unsolved SPR and approved SW&D related to the version of the software configuration item. |
spacebert_ecss | When in the Connecting state, the Link state machine shall initiate the following actions: 1. Start a 12,8 µs timer on entering the Connecting state. 2. Assert the Transmit Enable control flag, but only pass FCTs and Nulls to the Encoding Layer, following the rules described in clause 5.5.6. 3. Assert the Receive Enable control flag without storing any N-Chars received from the Encoding Layer in the RX FIFO and without registering any broadcast codes received from the Encoding Layer. |
2007_trs_mrd_web | Lower level science requirements shall be fulfilled (TBC) |
spacebert_ecss | For the assessment of commercial components, the supplier shall collect the available data on the manufacturer and the component in the JD. Specified in the requirement 5.2.4.d. |
spacebert_ecss | Data segments, FCTs and broadcast messages shall be temporarily placed in an error recovery buffer prior to passing them to the Multi-Lane or Lane layer for sending over the SpaceFibre link, so that they can be resent if an error occurs. |
spacebert_ecss | In case the test fails because the set voltage is not achieved due to high capacitance caused by presence of plane layers, one further re-test may be performed with adjusted parameters. |
2008_peering_PURE | Mediator-SR, mediator-PR, mediator-PA interaction protocols are defined. |
spacebert_ecss | No physical contact with the hardware shall take place during an inspection. |
2006_eirenesys15_PURE | The following supplementary services, identified in section 2, are to be supported for each type of mobile radio: |
spacebert_ecss | If a filter unit is required, its design and location shall be defined. |
2005_microcare_PURE | The above mentioned payment terms will help the MSIU to make the payment detail easy and also help the VSP to get their payment in timeThe system will control the payment process and terms. The allowed users only can able to Add, Modify or delete the VSP master information including payment terms. The VSP screen will have the provision to view the Claim Status of selected VSP. The system will facilitate to show the user following details if necessary. VSP Name (as the report header and below as the details part of report) Claim No Date Date of System Entry Amount Status Remarks |
2011_dot_WEB | The Core System shall receive misbehavior reports from System Users. |
2021_tmt_oad_WEB | ESW shall provide visualization UIs or tools that support environmental conditions presentation. |
2007_jwst_mrd_web | The Ground Segment shall generate wavefront error correction commands for uplink to the Observatory from the downlinked wavefront sensing data. |
spacebert_ecss | In conformance with clause 6.4.3.16, the SCD-SCA shall include the test temperature, in °C and the capacitance test method as specified either in clause 11.1 or 11.2 of this Standard. |
spacebert_ecss | The Type-B fibre optic cable shall contain two or more multi-mode, graded index, 50/125 µm fibres as specified in MIL-PRF-49291/1-01:2014. |
spacebert_ecss | The event-action subservice capability to delete event-action definitions shall be declared when specifying that subservice. |
spacebert_ecss | Wires terminating at terminals that do not have a mechanical shoulder or turret shall not be attached closer than one conductor diameter to the top of the terminal. |
spacebert_ecss | Hardware shall not be exposed to environments causing chemical contamination. |
spacebert_ecss | The supplier shall select, and propose to the safety approval authority, the safety verification methods to be used in conformance to the applicable safety requirements. |
spacebert_ecss | The NRB shall decide on the necessity and extent of any retest activity in order to demonstrate the correctness of the disposition made. |
spacebert_ecss | The connector contacts for Type-C EGSE to flight adaptor cable assemblies shall be terminated as shown in Table 5-24 and illustrated in Figure 5-17. |
spacebert_ecss | An actionee and a due date shall be entered for the implementation. |